Chhattisgarh 1 is a 30 MW project under the Chhattisgarh Solar Policy, 2012-2017. Three PPAs for the project were signed with Chhattisgarh State Power Distribution Company Limited at tariff rates of Rs. 6.44, Rs. 6.45 and Rs. 6.46 per kilowatt hour for a period 25 years. The projects commenced full operations in August 2015.
All Projects Page
- 2015First private utility scale solar power plant in the stateChhattisgarh State Power Distribution Company LimitedDurg, Chhattisgarh30 MW
Andhra Pradesh 1 is a 50 MW project for which, the PPA was signed with Southern Power Distribution Company of Andhra Pradesh Limited in December 2014 with a tariff of Rs. 5.89 per kilowatt hour for one year, increasing by 3% each year from the second year to the tenth year and thereafter with the same tariff as that in year ten for the remainder of the 25-year term. This project commenced operations in March 2016.
2016The largest capacity solar plant at a single site upon commissioning in the state of Andhra PradeshSouthern Power Distribution Com of AP LtdAnantapur, Andhra Pradesh50 MWRajasthan 1 is a 5 MW project that was constructed over a period of nine months. The project was commissioned in December 2011. The PPA was signed in January 2011 with NTPC Vidyut Vyapar Nigam Limited with a tariff of Rs. 11.94 per kilowatt-hour for a period of 25 years.
2011Project recognized by MNRE for early commissioning under JNNSM Phase-1 Batch-1NTPC Vidyut Vyapar Nigam LimitedNagaur, Rajasthan5 MW