Rajasthan 2 is a 35 MW project that was constructed over 11 months. The two PPAs for the project were signed in January 2012 with NTPC Vidyut Vyapar Nigam Limited, each with a tariff of Rs. 8.21 per kilowatt hour for a period of 25 years. The project commenced full operations in the first quarter of 2013.

Project Highlights

  • Project Size: 35 MW
  • Project Type: Utility
  • Location: Nagaur, Rajasthan
  • Offtaker: NTPC Vidyut Vyapar Nigam Limited
  • Area Covered: 302 acres
  • Commissioned: 2013